Guangdong Zhuhai Construction Engineering Co., Ltd.

Guangdong Zhuhai Construction Engineering Co., Ltd.

18938224246
Notice:
News Center
RecommendedProducts
Contact usContact us

Name: Guangdong Zhuhai Construction Engineering Co., Ltd.

Tel: 0769-28820525

Fax: 0769-28820525

H/P: 18938224246

Email: zhuhaijsgc@163.com

Website: www.zhuhaijsgc.com

Address: Room 113, 105 Taixin Road, Wanjiang Street, Dongguan City, Guangdong Province

Position:Home Page > News > Corporate news >

The main damage factors of steel structure engineering and the strengthening measures

table of Contents:Corporate newsPublished:2019-06-15 09:08:40Click to rate:

RSS订阅Big in small

The main damage factors of steel structure engineering and the strengthening measures


1. The main factors of steel structure engineering damage are:


(1) insufficient bearing capacity of the structure is caused by changes in load, overdue service, and changes in specifications and regulations;


(2) due to various unexpected deformation, distortion, disability, depression, etc., member section is weakened, member warping, connection cracking, etc.;


(3) deformation, cracking and warping of components or connections caused by temperature difference;


(4) corrosion caused by the erosion of chemical substances and electrochemical corrosion lead to the weakening of the section of engineering members of steel structure;


(5) other mistakes in design, production and construction as well as illegal use and operation during the service period.

Guangdong Zhuhai Construction Engineering Co., Ltd. ©Copyright 2019

support hotline:18938224246


关注微信WeChat sweep